Project Progress: Providence Cedars-Sinai Tarzana Reimagined

We are excited to share the project progress on Providence Cedars-Sinai Tarzana Medical Center - Tarzana Reimagined Project captured by Seth Williams on January 18, 2023.


Multi-level building with mixed fascade to include glass. Background is blue sky with wispy clouds. foreground is dirt with wooden stakes. Construction workers in PPE, yellow and orange vests and white hard hats, working - construction safety fence and construction materials.
New main lobby and turnaround (New Building 1)

Multi-level building with mixed fascade to include glass. Background is blue sky with wispy clouds. foreground is dirt with wooden stakes. Construction safety fence, scaffolding, and construction materials.
New main lobby and turnaround (New Building 1)

Unfinished lobby area, back curved  upper accent wall is tapped and mudded prepped for finishing, under that is steel framing, exposed areas  of concrete walls, pillars, and mechanical, pluming, and electrical. two orange and silver construction ladders, HVAC materials and other construction materials are behind orange caution pillars with yellow white cap caution cuidado construction tape.
New main lobby (New Building 1)

Hallway with finished beige walls, floors are covered with construction cardboard and blue painters tape, furniture is covered with blue protective construction blankets, ceiling has some panels but mostly exposed to the mechanical, electrical, and plumbing, multiple rooms with sliding glass and medal doors. two red construction fire safety stations equipped with fire extinguishers
Building 1 expansion new Prep/Recovery (New Building 1)

Hallway with finished beige walls, floors are covered with construction cardboard and blue painters tape, furniture is covered with orange protective construction blankets, ceiling has some panels but mostly exposed to the mechanical, electrical, and plumbing, multiple rooms with sliding glass and medal doors. room to the very back shows the headwall with electrical and medical gas boxes and finish plates
Building 1 expansion new Prep/Recovery (New Building 1)

View into unfinished patient room with sliding glass and medal doors. the headwall has electrical and medical gas boxes and finish plates, ceiling has some panels installed and lighting panels, but some are not yet installed
Building 1 expansion new Prep/Recovery (New Building 1)

Finished hallway with beige walls, brown and beige vinyl tile floor, aucoustic style ceiling panels installed with lights, a few panels not yet installed, handrails on hallway walls, doors and white and silver with observation window, one room visible with headwall and electrical and medical gas boxes with finish plates, privacy curtain is green and blue plaid
Level 2 Peds ICU (New Patient Wing)

Hallway with finished beige walls, floor is beige and dark brown vinyl tile, two large desks with white front and dark brownish purple counter tops, back left wall has half-circle design feature painted in purple, on top of desk are folded furniture protection blankets that are blue and brown, there is a rolling cart toward the back of the hallway, the ceiling is finished with aucoustic tile, in the middle the ceiling is accented with a wood finish and accent lighting, patient room to the back of the hallway with a white and silver door and observation window
Level 2 Peds ICU (New Patient Wing)

Inside patient room headwall with mechanical gas and electrical boxes with finish plates, accent lighting around headwall, white door with silver handle that leads to bathroom, black monitor arm installed to the right, floor is designed with light brown, light purple, and beige tile, window to outside in the back but view is obscured by bathroom door, ceiling is acoustic tile with a few not yet installed, privacy drape is plaid in greens and blues
Level 2 Peds ICU (New Patient Wing)

Waived architecture multi-level building façade with glass,  background is blue skies with white wispy clouds, ground is dirt, orange saftey cones, orange and yellow construction mechanical equipment, red construction dumpster
New Patient Wing Exterior Progress

Waived architecture multi-level building façade with glass,  background is blue skies with white wispy clouds,  another building all dark glass to the right, construction safety fencing, ground is dirt, orange safety cones, orange and yellow construction mechanical equipment, red construction dumpster, capped off green and white pipe in ground
New Patient Wing Exterior Progress

White male, with brown beard, safety glasses that are clear with black framing, hard hat that is white and light silver, Equinox logo Seth Williams Information Technology on hard hat, he is wearing a white collared shirt, covered by a blue v-neck sweater, covered by a yellow and silver saftey vest, with sunglasses hanging from the side of the vest, in background is waved architectural building façade with glass, another all dark glass building to the right, ground is concrete, there is a tarped pile of construction materials as well as a blue dumpster, there are a few construction workers in PPE walking in background, there is a street light to the right and port-a-potties to the left
Seth Williams outside of New Patient Wing Exterior